Northlake Dock · 2309

Private records / meter billing

Which boat was charged for each meter?

Some boats were billed from the wrong meter. For each boat, this page separates the meter it actually uses from the meter its account was assigned to, then shows the recorded charges. Dollars are amounts charged, not electricity consumed. The 3D arrows point from the boat using a meter to the boat assigned charges from that meter.

See 3D arrows →See numbered dock map →
Unit #1 example

Unit #1 uses meter #8, but its account was assigned charges from meter #1. The corrected sheet places meter #1 at Unit #18. Unit #1’s account has $5,079.81 in recorded charges, assumed paid. Under the older assignment, meter #8 was billed to Unit #2’s account, which has $3,690.43 in recorded charges. Both dollar figures cover different account histories; neither is kWh, and their difference is not a proven refund. Meter #8 changed by 1,420 kWh from August 30 to October 4, 2026. Total kWh since move-in is unknown.

Boat #2 example

Boat #2 uses meter #7, which rose by 706 kWh from August 30 to October 4, 2026. The older assignment sheet does not assign meter #7 to any boat or facility account. We therefore cannot identify from these files who was charged for meter #7 or calculate Boat #2’s historical meter-based dollar total. “Unknown” does not mean $0. Boat #2’s own recorded charges, $3,690.43, were assigned to meter #8, which the corrected sheet places at Boat #1.

Evidence limit

The two meter assignment sheets are October 2026 snapshots; the charge register has no meter ID on each row. Historical dollar links assume those assignments also held for earlier charges. Every charge is assumed paid at the resident’s instruction, net of credits. Meter labels such as “#1” identify electric meters, not boat numbers. Meter icons in 3D are diagrammatic because pedestal coordinates were not surveyed.

01 / wrong-meter assignments

Boat using meter → boat charged from it

02 / all numbered slips

Meter use and billing

Charges are summed by account from January 2021 through October 2026, assumed paid and net of credits. The amount “assigned to this boat’s meter” is an inference from the older billing assignment; the register does not identify a meter on each charge. The #14–15 account is shared and cannot be split. Recent measured kWh covers only August 30 to October 4, 2026; lifetime kWh needs an opening reading or full history.

Boat / map ownerMeter used for its billsMeter this boat usesMeasured kWh / lifetimeWhere its billing meter isPaid by this account ($)Assigned to this boat’s meter ($)2026 account charges ($)Source rows

03 / missing history

Opening readings needed

For a dedicated source meter, lifetime consumption is its latest cumulative reading minus the reading when that household began using it, adjusted for any meter replacement or shared load. Neither spreadsheet supplies those opening readings. Download the meter-reading template ↧ with the corrected meter IDs and latest readings already filled in.

Show the available Aug 30–Oct 4, 2026 meter snapshot
MeterNew mapped unitAug 30Oct 4DifferenceNew-sheet row

04 / marina company leases

Facility meters also moved

The legacy marina-company rows include two meters that the corrected sheet maps to numbered units. These company leases are not named accounts in the supplied charge register, so no dollar allocation is inferred.

Company leaseLegacy meterCorrected company rowSame meter now mapped toSource rows

05 / charge ledger

Each named account

All entries below are assumed paid. Open an account to review individual charge dates, amounts, period notes, and source row numbers. Bob & Freyda Greenberg appear in the older register, but the supplied 2026 map does not establish their former unit.

Source files

Resident-supplied spreadsheets

“Marina Electric.xlsx” is byte identical to “Marina Electric new.xlsx”; the distinct legacy file is “Marina Electric (1).xlsx.” The two ChargeRegister copies in Downloads are also identical. Names and vacancies on the 3D dock remain anchored to the resident-supplied 2026 marina plan.